The three goals of the operation
All three are done in the same session. The channel is missing only the last few centimeters of its proper length, so rather than building a tube from scratch, the existing groove is simply closed over.
- Moving the opening to the tip of the head.
- Making the urine stream straight and single-directional.
- Closing the head so it looks natural.

